Campaign | Objective |
---|
JOSIE-1996 GAW Report No. 130 | - Operating Procedures
- Profiling Capabilities
- Intercomparison sonde types (e.g. ECC, Brewer-Mast, KC79)
|
JOSIE-1998 GAW Report No. 57 | - ECC sonde manufacturer differences (SPC, ENSCI)
- Brand new sondes provided by sounding stations randomly taken)
|
JOSIE-2000 GAW Report No. 158 | - Operating Procedures
- Focus on ECC sonde
- Different sensing solution types
- Different manufacturers (SPC, ENSCI)
- Basis for a preliminary SOP-V1.0 adopted in April 2001 at a workshop at Geneva, Switzerland
|
BESOS-2004 [Deshler et al., J.Geophys.Res., 2008] | - Testing Standard Operating Procedures (SOP V1.0) under flight conditions
- Focus on ECC sonde
- Different sensing solution types
- Different manufacturers (SPC, ENSCI)
- Unanimous agreement on SOP’s by the ASOPOS 1.0 Panel – outcome of a Jülich Workshop in September 2004
|
ASOPOS 2002–2012 GAW Report No. 201 | - Define and establish Standard Operating Procedures for ECC sondes: Evolution of SOP-V1.0 into new SOP-V2.0
|
JOSIE-2009 | - Compared newly manufactured ECC sondes (SPC, ENSCI)
- Brand new sondes provided by sounding stations (randomly taken)
|
JOSIE-2010 | |
JOSIE-2017-SHADOZ [Thompson et al., BAMS, 2019] | - Tested manufactured ECC sondes (SPC, ENSCI) provided by participating sounding stations
- Tested Standard Operating Procedures for ECC sondes
- Preparatory Workshop was conducted in September 2016 at Edinburgh, UK, at Quadrennial Ozone Symposium
|
O3S-DQA Guidelines Report-2012
[Smit and O3S-DQA, 2012]. | - Recommendations for Homogenization and Uncertainties
- Basis was several workshops:
- January 2009 at Jülich, Germany
- October 2011 at Boulder, USA.
- April 2012 at Washington, USA.
- September 2012 at Toronto, Canada
|
ASOPOS 2018–2021 GAW Report No. 268 | - Define and establish consistent Standard Operating Procedures for ECC sondes and Guidelines for best practice
|